|
|
|
|
|
| The company firmly believes in the concept
of Total Quality Management - a process of achievement
of total quality by harnessing the commitment of all human
resources coupled with construction management and technology,
which help the company to surge ahead in its growth path
as something that provides benefits to our clients. |
metal building |
| Considering the emerging economic environment
in India, which will escalate growth and development,
we are interested to work in collaboration with your esteemed
organization in near future and will appreciate if a meeting
is called, the date, time and venue of which may please
be communicated to us. |
|
|
| |
| REASONS FOR CHOOSING
SML'S PEB SYSTEMS |
| |
|
1. |
Maximize profitability
by cutting cost at the multiple level: |
| |
|
|
Start-up
cost |
|
|
Constructions
cost |
|
|
Maintenance
costs |
|
|
Life Cycle
Cost |
|
|
|
2. |
Grade of Steel/Quality |
| |
|
|
High Tensile
Steel (Grade 50-ASTM-A 572) For Structure |
|
|
Galvalume
Roof/wall cladding systems ( AZ150Gsm/550Mpa
) steel. |
|
|
Design Parameters
- Wind Speeds, Loads, Seismic Zone etc. |
|
|
|
|
|
|
3. |
Time Schedule |
| |
| As compared to the conventional
building the time required by the PEBs is just a
small fraction. This is so because the building
material is: |
|
|
Pre-welded |
|
|
Pre-drilled |
|
|
metal building |
|
|
Pre-punched |
|
|
Pre-fabricated all in
all with proper fitments |
|
|
| |
|
4. |
Customized building as per
the need in terms of |
| |
|
|
Dimensions of the building
(Length/Width/Height) |
|
|
Clear Spans or Multiple
Bays |
|
|
| |
|
5. |
Flexibility to have floor
plan as desired or even change |
|
| |
|
6. |
Matrial Feature |
| |
|
|
Corrosion Resistance
steel |
|
|
Corrosion Resistance
roof and wall cladding sheets. |
|
|
Higher structural strength |
|
|
| |
|
7. |
Heat Regulation |
| |
|
|
Proper ventilation |
|
|
Specific ventilation
mechanism to suit individual application |
|
|
| |
|
8. |
Aesthetics |
| |
|
|
Contemporary look |
|
|
Range of colors |
|
|
| |
|
9. |
Easy to erect and easy to
dismantle |
|
| |
|
10. |
Knock down assembly. Easy
to dismantle any time. |
|
|
| |
|
| |
|
|
SML GROUP is committed, to achieve
CLIENT'S SATISFACTION, by consistently
meeting their specified requirements, in terms of
|
QUALITY
COST-EFFECTIVENESS
TIMELY COMPLETION
metal building
|
|
|
|
Our dedicated team shall achieve this through
strict adherence to |
|
QUALITY MANAGEMENT SYSTEM
CONTINUAL IMPROVEMENT
ADAPTATION OF NEW TECHNOLOGIES
metal building
|
|
|
|
Aimed at developing SML GROUP as the client's
ultimate priority in construction services. |
| |
|
|
|
metal
building metal building metal building metal building |
|
metal
building ,
pre-engineered metal buildings
,
pre-engineered metal building india
,
pre-engineered metal building delhi
,
pre-engineered metal buildings india
,
pre-engineered metal buildings delhi
,
metal buildings india
,
metal buildings delhi
,
steel structures india
,
steel structures delhi
,
pre-fabricated structures india
,
pre-fabricated structures delhi
,
structure for ware house and shed
,
roofing and cladding sheeting
, z purlin
, metal decking
, mezzainine
floor ,
metal commercial building
,
pre-fabricated metal building
,
prefab metal building
,
pre-engineered building
,
pre-engineered metal building
,
pre-engineered steel frame building
,
pre-engineered steel building
,
prefab steel building
,
pre-fabricated steel building
,
commercial steel building
, |
|
|
|
| |
|